Saxony clinic in Leipzig-Bennewitz
In the neurological rehabilitation clinic in Leipzig-Bennewitz, which specialises in orthopaedics and neurology, waterproofing and tiling work was carried out over approx. 600m² in the showers and adjacent corridors. SCHOMBURG products were chosen for the work.
The priming and consolidating mortar resin ASODUR-GBM was used for priming. Waterproofing was carried out with ASOFLEX-R2M (known as System DENSARE today) on floors and walls. UNIFIX, system adhesive from SCHOMBURG was used as the tile adhesive and grouting was finally completed with today's ASODUR-EK-98-Boden.
SCHOMBURG GmbH, JD
Applications:
Waterproofing
Tile compound waterproofing
Tile laying
Prime coat
Grouting
Object size: approx. 600 m²
Applied products:
ASODUR-EK98-Boden
ASODUR-GBM
UNIFIXConstruction duration: 1/ 1997
Place: Germany / Leipzig
Executive firm:
Fliesen Lechner GmbH
Fliesen Lechner GmbH
04668 Grimma